Formula Hub
Fast field math for takeoffs, orders, and training.
Area calculator
Paver Patio Dimensions
Enter the finished footprint you're building (rectangle or circle).
0 sq ft
This is just the footprint you need to cover so every other calc stays in sync.
Site prep
Base Material
Crushed stone foundation under the patio plus the edge-restraint shoulder.
Using area: 0 sq ft • Excavation min: 9 in
Think of base like filling a box under the patio. Base extension tells us how far that box extends past the pavers for edge restraint.
Screed layer
Bedding Chips / Bedding Sand
Thin leveling layer above the base, staying inside the finished footprint.
Using area: 0 sq ft
This is the thin screed layer under pavers. Keep it tight so your surface stays flat.
Water management
Drainage Drop
Shows how much lower the far edge should be so water exits the surface.
This shows how much lower the far side needs to be so water leaves the patio instead of pooling.
Surface
Paver Quantity
Counts all laying units plus a waste cushion for cuts and patterning.
Using area: 0 sq ft
Counts the exact number of pavers plus extra for cuts, breakage, and pattern layout.
Joint protection
Polymeric Sand
SEK Surebond coverage for PolySweep or X-Treme Wide Joint based on joint width.
Using area: 0 sq ft
PolySweep covers joints up to 3/4". Wider joints automatically switch to X-Treme Wide Joint.
Wider joints eat more sand. We show a safe order quantity plus the low/high range so you never run short.
Order list
Copy Order List
Order list copied.
Share this with your supplier or crew. Always verify with site conditions.
Totals
Total Base Requirement
Under-paver footprint plus the base extension shoulder, shown in one line.
Order this amount of base material (crushed stone) total.
Cost mode (optional)
Quick Material Cost
Add any unit costs to get a quick subtotal.
Material subtotal only. Add labor, delivery, and markup in your estimate.